CheckbookVendor
What has the City paid Clarke Contracting Corporation?
$36.5M in City payments across 364 checks, from July 17, 2017 to September 8, 2026. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.
As published: CLARKE CONTRACTING CORPORATION
The Controller records vendor names as free text, so this firm appears under 2 different spellings. They are added together here, and listed in full so the arithmetic is checkable:
- CLARKE CONTRACTING CORP
- CLARKE CONTRACTING CORPORATION
By fiscal year
Who pays them
What for
74 payments
16 payments
7 payments
10 payments
11 payments
5 payments
13 payments
14 payments
8 payments
7 payments
5 payments
7 payments
* FY2026-27 is still in progress — $1.1M so far, not a full year. Same point of FY2025-26 (payments dated through Sep 9, 2025): $809K.
Most recent payments
The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.
| Date | Budget line | Purpose | Amount |
|---|---|---|---|
| September 8, 2026 | Mount Washington Drive (581) BulkheadNon-departmental | $483,075.00 E1909283/ 59V/50/50AZCO/ NTP 1 DTD 3-10-26 MT WASHINGTON | $48,156 |
| September 4, 2026 | On Call Contractors (Emergency Funds)Non-departmental | ESDR/511/SZS12065/R1/R2/R3/R4 | $81,789 |
| August 21, 2026 | Bienveneda Ave (559) Bulkhead Lagging ReplacementNon-departmental | $500,000.00 E1909488/ 59V/50/50CZES/ NTP 1 DTD 4-27-26 BIENVENEDA (559) | $1,625 |
| August 11, 2026 | Mount Washington Drive (581) BulkheadNon-departmental | $483,075.00 E1909283/ 59V/50/50AZCO/ NTP 1 DTD 3-10-26 MT WASHINGTON | $123,798 |
| July 28, 2026 | Avon Street (1923) BulkheadNon-departmental | E1909302/ 59V/50/50AZBY/ NTP 1 DTD 3-19-26 AVON (1923) | $19,239 |
| July 21, 2026 | Mount Washington Drive (581) BulkheadNon-departmental | $483,075.00 E1909283/ 59V/50/50AZCO/ NTP 1 DTD 3-10-26 MT WASHINGTON | $226,542 |
| July 17, 2026 | Bienveneda Ave (559) Bulkhead Lagging ReplacementNon-departmental | E1909488/ 59V/50/50CZES/ NTP 1 DTD 4-27-26 BIENVENEDA (559) | $240,763 |
| July 15, 2026 | Erosion Control for Hillside DamageNon-departmental | EROSION CONTROL FOR HILLSIDE DAMAGE (FY 25/26) | $4,845 |
| July 14, 2026 | Erosion Control for Hillside DamageNon-departmental | E1909447/ 59V/50/50CZEX/ CO 2 DTD 5-26-26 EROSION (FY25-26) | $65,876 |
| July 10, 2026 | Laurel Cyn Bridge and Foothill BL Bridge Rail Replcment ProjNon-departmental | PAYMENT CLARKE CON. PR#7 FINAL, F298/50/50YLCF, WO#E1908926 LAUREL CANYON FOOTHILL BRIDGE RAIL | $20,000 |
| July 7, 2026 | Avon Street (1923) BulkheadNon-departmental | E1909302/ 59V/50/50AZBY/ NTP 1 DTD 3-19-26 AVON (1923) | $288,706 |
| June 22, 2026 | Bienveneda Ave (559) Bulkhead Lagging ReplacementNon-departmental | E1909488/ 59V/50/50CZES/ NTP 1 DTD 4-27-26 BIENVENEDA (559) | $234,413 |
| June 17, 2026 | Laurel Cyn Bridge and Foothill BL Bridge Rail Replcment ProjNon-departmental | PAYMENT CLARKE CON. PR#6 PARTIAL, F298/50/50YLCF, WO#E1908926 LAUREL CANYON FOOTHILL BRIDGE RAIL | $29,620 |
| May 15, 2026 | On Call Contractors (Emergency Funds)Non-departmental | ESDR/511/SZS12065/R1/R2/R3 | $84,709 |
| May 12, 2026 | Jefferson Blvd K-RailNon-departmental | WO E1909553/JEFFERSON, WEST OF LINCOLN, EMERG. K-RAIL | $103,444 |
| May 1, 2026 | City of Los Angeles Bridge Rail Replacement ProjectTransportation | 59C/94TV63/E1908926 LAUREL CANYON BLVD & FOOTHILL BLVD BRIDGE REPLACEMENT PROJ | $9,035 |
| April 9, 2026 | Erosion Control for Hillside DamageNon-departmental | EROSION CONTROL FOR HILLSIDE DAMAGE (FY 25/26) | $188,496 |
| March 18, 2026 | On Call Contractors (Emergency Funds)Non-departmental | ESDR/511/SZS12047 | $681 |
| March 12, 2026 | On Call Contractors (Emergency Funds)Non-departmental | ESDR/511/SZS12043/R1/R2 | $81,335 |
| February 18, 2026 | Tramonto and Bienveneda Tiebacks - Wildfire RecoveryNon-departmental | TRAMONTO DR (17537) BULKHEAD AND BIENVENEDA AVE (559) BULKHEAD TIEBACK TESTING | $8,790 |
| January 16, 2026 | City of Los Angeles Bridge Rail Replacement ProjectTransportation | 59C/94TV63/E1908926 LAUREL CANYON BLVD & FOOTHILL BLVD BRIDGE REPLACEMENT PROJ | $24,025 |
| January 14, 2026 | Erosion Control for Hillside DamageNon-departmental | EROSION CONTROL FOR HILLSIDE DAMAGE (FY 25/26) | $147,039 |
| December 17, 2025 | Tramonto and Bienveneda Tiebacks - Wildfire RecoveryNon-departmental | TRAMONTO DR (17537) BULKHEAD AND BIENVENEDA AVE (559) BULKHEAD TIEBACK TESTING | $10,070 |
| December 16, 2025 | Tramonto and Bienveneda Tiebacks - Wildfire RecoveryNon-departmental | TRAMONTO DR (17537) BULKHEAD AND BIENVENEDA AVE (559) BULKHEAD TIEBACK TESTING | $124,018 |
| December 16, 2025 | Tramonto and Bienveneda Tiebacks - Wildfire RecoveryNon-departmental | TRAMONTO DR (17537) BULKHEAD AND BIENVENEDA AVE (559) BULKHEAD TIEBACK TESTING | $75,021 |
Sources
LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.