CheckbookVendor

What has the City paid Mge / V&a, a Joint Venture LLP?

$9.6M in City payments across 105 checks, from December 7, 2017 to June 3, 2025. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.

Checkbook LA · Through Sep 9, 2026

As published: MGE / V&A, A JOINT VENTURE LLP

$9.6MTotal paid
105Payments
$90,953Average payment
FY2023-24Peak full year · $3.0M

By fiscal year

FY2017-18
$301K
FY2018-19
$908K
FY2019-20
$1.4M
FY2020-21
$410K
FY2021-22
$286K
FY2022-23
$1.6M
FY2023-24
$3.0M
FY2024-25
$1.7M

Most recent payments

The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.

DateBudget linePurposeAmount
June 3, 2025Broadway Streetscape Improvements, 1st to 12th StreetsTransportationC-134469 TOS#113 INV.630.08 94ST1O$171,589
February 13, 2025Pavement Preservation - Access RampsNon-departmentalSTREETSLA PROG/TOS702B/M0A16606/NTP5_7/1-11/12/24$356,119
February 13, 2025Pavement Preservation - Access RampsNon-departmentalSTREETSLA PROG/TOS702B/M0A16606/NTP4_7/1-11/12/24$47,945
February 10, 2025Contractual ServicesPublic Works – Street ServicesENGINEERING AND DESIGN SERV FOR TOS 702B FOR STREETS LA PROGRAMS-WO#M0016541$38,365
December 12, 2024Colorado Bridge Undercrossing East Bank RiverwayNon-departmental682/50/50WVJK/E1909027/TOS 204/NTP2 NORTH ATWATER EAST BANK RIVERWAY PROJECT$372,826
December 12, 2024Colorado Bridge Undercrossing East Bank RiverwayNon-departmental682/50/50WVJK/E1909027/TOS 204/NTP2 NORTH ATWATER EAST BANK RIVERWAY PROJECT$294,126
October 28, 2024Colorado Bridge Undercrossing East Bank RiverwayNon-departmental682/50/50WVJK/E1909027/TOS 204/NTP1 NORTH ATWATER EAST BANK RIVERWAY PROJECT$100,475
October 28, 2024Colorado Bridge Undercrossing East Bank RiverwayNon-departmental682/50/50WVJK/E1909027/TOS 204/NTP1 NORTH ATWATER EAST BANK RIVERWAY PROJECT$37,525
September 11, 2024Pavement Preservation - Access RampsNon-departmentalSTREETSLA PROG/TOS702B/M0A16606/NTP4_5/1-6/30/24$94,182
September 11, 2024Contractual ServicesPublic Works – Street ServicesENGINEERING AND DESIGN SERV FOR TOS 702B FOR STREETS LA PROGRAMS-WO#M0016541$608
August 6, 2024Broadway Streetscape Improvements, 1st to 12th StreetsTransportationC-134469 TOS#113 INV.630.07 94ST1O$57,260
July 25, 2024Contractual ServicesPublic Works – Street ServicesPAVEMENT PRESERVATION PROGRAM, NTP 4$7,333
July 24, 2024Pavement Preservation - Access RampsNon-departmentalINV#689.07_4/1 TO 4/30/24$73,984
July 10, 2024Pavement Preservation - Access RampsNon-departmentalSTREETSLA PROG/TOS702B/M0A16606/NTP3_3/1-3/31/24$904
June 11, 2024Broadway Streetscape Improvements, 1st to 12th StreetsTransportationC-134469 TOS#113 INV.630.06R2 94ST1O$115,473
June 11, 2024Broadway Streetscape Implementation - 8th St to 9th StTransportationC-134469 TOS#113 INV.630.06R2 94NT64$5,704
June 7, 2024Los Angeles River Bike Path Repair Near Ferraro FieldsTransportationTOS 95 F59C/94WV64 LA RIVER BIKE PATH REPAIRS/FERRARO ATHLETIC FIELD PROJECT$20,684
June 7, 2024Los Angeles River Bike Path Repair Near Ferraro FieldsTransportationTOS 95 F59C/94WV64 LA RIVER BIKE PATH REPAIRS/FERRARO ATHLETIC FIELD PROJECT$6,357
May 31, 2024Contractual ServicesPublic Works – Street ServicesPAVEMENT PRESERVATION PROGRAM, NTP 4$71,894
April 17, 2024Contractual ServicesPublic Works – Street ServicesPAVEMENT PRESERVATION PROGRAM, NTP 4$12,585
April 12, 2024Pavement Preservation - Access RampsNon-departmental41A/50/50YKJS/M0A16606/TOS702B/NTP3$18,918
March 15, 2024Pavement Preservation - Access RampsNon-departmental41A/50/50YKJS/M0A16606/TOS702B/NTP3$333,511
March 15, 2024Pavement Preservation - Access RampsNon-departmental41A/50/50WKJS/M0A16606 TOS 702B NTP2 PAVEMENT PRESERVATION PROG$117,174
March 15, 2024Pavement Preservation - Access RampsNon-departmental41A/50/50YKJS/M0A16606/TOS702B/NTP3$107,500
March 15, 2024Contractual ServicesPublic Works – Street ServicesPAVEMENT PRESERVATION PROGRAM, NTP 4$58,188

Sources

LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.