CheckbookVendor
What has the City paid Mge Engineering Inc.?
$1.8M in City payments across 6 checks, from October 20, 2025 to September 9, 2026. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.
Checkbook LA · Through Sep 9, 2026
As published: MGE ENGINEERING INC.
$1.8MTotal paid
6Payments
$307,862Average payment
FY2025-26Peak full year · $1.4M
By fiscal year
FY2025-26
$1.4M
FY2026-27 *
$444K
Who pays them
Non-departmental$1.1M
Transportation$762K
What for
3 payments
2 payments
1 payment
* FY2026-27 is still in progress — $444K so far, not a full year. Same point of FY2025-26 (payments dated through Sep 9, 2025): $0.
Most recent payments
The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.
| Date | Budget line | Purpose | Amount |
|---|---|---|---|
| September 9, 2026 | Pavement Preservation - Access RampsNon-departmental | $1,025,296.94 59V/50AKJS M0A16606 TOS: 38B, NTP #2 | $443,657 |
| June 22, 2026 | Colorado Bridge Undercrossing East Bank RiverwayNon-departmental | 682/50/50WVJK/TOS105/E1909027/NTP1&2 | $116,736 |
| May 4, 2026 | LADOT Access Ramp Design for Traffic Signals and UncontrolleTransportation | TOS38B CURB RAMP IMPROVEMENTS PROGRAM (PHASE 2) | $306,676 |
| March 2, 2026 | Pavement Preservation - Access RampsNon-departmental | $1,025,296.94 59V/50AKJS M0A16606 TOS: 38B, NTP #2 | $362,990 |
| February 3, 2026 | LADOT Access Ramp Design for Traffic Signals and UncontrolleTransportation | TOS38B CURB RAMP IMPROVEMENTS PROGRAM (PHASE 2) | $455,027 |
| October 20, 2025 | Pavement Preservation - Access RampsNon-departmental | $1,025,296.94 59V/50AKJS M0A16606 TOS: 38B, NTP #2 | $162,089 |
Sources
LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.