What has the City paid on purchase order SC89CO24003939K?
$8.70M paid to Asphalt Fabric Engineering Inc across 140 payments from July 31, 2023 to July 31, 2025, charged to Recreation and Parks - Special Accounts / Park Mitigation Fee.
What it was for
Park Mitigation FeeBudget line carrying the most money, of 6 this order is charged to.
Approval records
No council file, contract number or payment authority appears in this order's checkbook records.
Paid from
Recreation and Parks
restricted revenue (grants, fees or a dedicated tax) that can only be spent on this purpose — not general-fund tax dollars.
Department: Recreation and Parks - Special Accounts
Every payment, in order
Payment requests are numbered sequentially by the City, so the order here is the order they were approved. Several requests clearing on one day usually means invoices were held and released together.
| # | Paid | Invoiced | Lag | Reference | Amount |
|---|---|---|---|---|---|
| 1 | July 31, 2023 | July 21, 2023 | 10d | #21376 205/89SRGQ LINCOLN HEIGHTS RECREATION CENTER, INV# 51903 DTD 07/07/23 $16,230.82 | $16,231 |
| 2 | July 31, 2023 | July 21, 2023 | 10d | #21376 205/89SRGQ LINCOLN HEIGHTS RECREATION CENTER, INV# 51902 DTD 07/07/23 $8,013.79 | $8,014 |
| 3 | August 16, 2023 | August 11, 2023 | 5d | #21376 205/89SRGQ LINCOLN HEIGHTS RECREATION CENTER, INV# 51913 DTD 08/08/23 $4,037.00 | $4,037 |
| 4 | February 6, 2024 | January 30, 2024 | 7d | #21376 205/89SRGQ LINCOLN HEIGHTS RC, INV# 51949 DTD 01/08/24 $3,018.75 | $3,019 |
| 5 | February 7, 2024 | February 6, 2024 | 1d | #21376 205/89SRGQ LINCOLN HEIGHTS RC, INV# 51940 DTD 01/31/24 $6,660.85 | $6,661 |
| 6 | April 17, 2024 | April 8, 2024 | 9d | QT062613 #21748 302/89716H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $32,543 |
| 7 | April 17, 2024 | April 8, 2024 | 9d | QP001816 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $25,284 |
| 8 | April 17, 2024 | April 8, 2024 | 9d | QP002386 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $13,714 |
| 9 | April 17, 2024 | April 8, 2024 | 9d | QP002662 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $13,641 |
| 10 | April 17, 2024 | April 8, 2024 | 9d | QT077105 #21748 302/89716H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $7,740 |
| 11 | April 17, 2024 | April 8, 2024 | 9d | QP003028 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $7,662 |
| 12 | April 17, 2024 | April 8, 2024 | 9d | QP002529 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $6,841 |
| 13 | April 17, 2024 | April 8, 2024 | 9d | QP002078 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $6,315 |
| 14 | April 17, 2024 | April 8, 2024 | 9d | QP001503 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $6,088 |
| 15 | April 17, 2024 | April 8, 2024 | 9d | QP000903 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $74 |
| 16 | April 17, 2024 | April 8, 2024 | 9d | QP001062 #21748 302/89718H HUBERT H. HUMPHREY RC, INV# 51963 DTD 04/08/24 $119,966.00 | $64 |
| 17 | May 14, 2024 | May 10, 2024 | 4d | QT069684 #21761 302/89716H NORTH HILLS, INV# 12129 DTD 05/03/24 $281,225.00 | $120,046 |
| 18 | May 14, 2024 | May 10, 2024 | 4d | #21762 302/89460K-NH NORTH HILLS, INV# 12129 DTD 05/03/24 $281,225.00 | $118,229 |
| 19 | May 14, 2024 | May 10, 2024 | 4d | #21762 302/89440K-NH NORTH HILLS, INV# 12129 DTD 05/03/24 $281,225.00 | $42,950 |
| 20 | June 11, 2024 | June 7, 2024 | 4d | #21376 205/89SRGQ LINCOLN HEIGHTS REC CENTER, INV# 51958 DTD 03/19/24 $2,735.62 | $2,736 |
| 21 | August 6, 2024 | August 1, 2024 | 5d | QP002218 #21736 302/89718H SEOUL INTERNATIONAL PARK, INV# 51989 DTD 07/29/24 $966,924.00 | $836,629 |
| 22 | August 6, 2024 | August 1, 2024 | 5d | QP002218 #21736 302/89718H SEOUL INTERNATIONAL PARK, INV# 51989 DTD 07/29/24 $966,924.00 | $129,823 |
| 23 | August 6, 2024 | August 1, 2024 | 5d | QP002615 #21736 302/89718H SEOUL INTERNATIONAL PARK, INV# 51989 DTD 07/29/24 $966,924.00 | $472 |
| 24 | August 9, 2024 | August 5, 2024 | 4d | QP003385 #21749 302/89718H RIO DE LOS ANGELES STATE PARK, INV# 51972 DTD 7/29/24 $1,184,795.00 | $865,812 |
| 25 | August 9, 2024 | August 5, 2024 | 4d | QP003385 #21749 302/89718H RIO DE LOS ANGELES STATE PARK, INV# 51972 DTD 7/29/24 $1,184,795.00 | $318,983 |
| 26 | August 21, 2024 | August 20, 2024 | 1d | QT061020 #21748 302/89716H HUBERT H. HUMPHREY REC CENTER, INV# 51977 DTD 05/30/24 $21,292.21 | $21,292 |
| 27 | October 7, 2024 | October 3, 2024 | 4d | QP003553 #21735 302/89718H BOYLE HEIGHTS SPORTS COMPLEX, INV# 52010 DTD 09/30/24 $218,034.85 | $218,035 |
| 28 | October 17, 2024 | October 15, 2024 | 2d | QZ144074 #21754 302/89718H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $75,005 |
| 29 | October 17, 2024 | October 15, 2024 | 2d | QT074282 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $54,267 |
| 30 | October 17, 2024 | October 15, 2024 | 2d | QM180430 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $39,407 |
| 31 | October 17, 2024 | October 15, 2024 | 2d | QP002333 #21754 302/89718H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $35,158 |
| 32 | October 17, 2024 | October 15, 2024 | 2d | QT074172 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $26,280 |
| 33 | October 17, 2024 | October 15, 2024 | 2d | QT074085 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $14,559 |
| 34 | October 17, 2024 | October 15, 2024 | 2d | QT073536 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $11,282 |
| 35 | October 17, 2024 | October 15, 2024 | 2d | QT066044 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $9,008 |
| 36 | October 17, 2024 | October 15, 2024 | 2d | QM151432 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, NTP DTD 12/26/23 $6,199.57 | $6,200 |
| 37 | October 17, 2024 | October 15, 2024 | 2d | QT074281 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $5,195 |
| 38 | October 17, 2024 | October 15, 2024 | 2d | QT070517 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $2,761 |
| 39 | October 17, 2024 | October 15, 2024 | 2d | QT082120 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $2,309 |
| 40 | October 17, 2024 | October 15, 2024 | 2d | QT074942 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $2,302 |
| 41 | October 17, 2024 | October 15, 2024 | 2d | QT077153 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $2,094 |
| 42 | October 17, 2024 | October 15, 2024 | 2d | QT072825 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,754 |
| 43 | October 17, 2024 | October 15, 2024 | 2d | QT073377 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,628 |
| 44 | October 17, 2024 | October 15, 2024 | 2d | QT074946 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,472 |
| 45 | October 17, 2024 | October 15, 2024 | 2d | QM161474 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,443 |
| 46 | October 17, 2024 | October 15, 2024 | 2d | QT078230 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,178 |
| 47 | October 17, 2024 | October 15, 2024 | 2d | QT073680 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,131 |
| 48 | October 17, 2024 | October 15, 2024 | 2d | QT073609 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $1,040 |
| 49 | October 17, 2024 | October 15, 2024 | 2d | QT074305 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $941 |
| 50 | October 17, 2024 | October 15, 2024 | 2d | QT073709 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $892 |
| 51 | October 17, 2024 | October 15, 2024 | 2d | QT073293 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $735 |
| 52 | October 17, 2024 | October 15, 2024 | 2d | QT073902 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $728 |
| 53 | October 17, 2024 | October 15, 2024 | 2d | QT074340 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $614 |
| 54 | October 17, 2024 | October 15, 2024 | 2d | QT066029 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $603 |
| 55 | October 17, 2024 | October 15, 2024 | 2d | QT073851 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $534 |
| 56 | October 17, 2024 | October 15, 2024 | 2d | QT074907 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $529 |
| 57 | October 17, 2024 | October 15, 2024 | 2d | QT073982 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $500 |
| 58 | October 17, 2024 | October 15, 2024 | 2d | QT074736 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $463 |
| 59 | October 17, 2024 | October 15, 2024 | 2d | QT073188 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $369 |
| 60 | October 17, 2024 | October 15, 2024 | 2d | QM132337 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $327 |
| 61 | October 17, 2024 | October 15, 2024 | 2d | QT073952 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $211 |
| 62 | October 17, 2024 | October 15, 2024 | 2d | QM154693 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $179 |
| 63 | October 17, 2024 | October 15, 2024 | 2d | QM163790 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $157 |
| 64 | October 17, 2024 | October 15, 2024 | 2d | QM153932 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $76 |
| 65 | October 17, 2024 | October 15, 2024 | 2d | QM170328 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $64 |
| 66 | October 17, 2024 | October 15, 2024 | 2d | QT073851 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $20 |
| 67 | October 17, 2024 | October 15, 2024 | 2d | QT074152 #21754 302/89716H YUCCA PARK COMMUNITY CENTER, INV# 52008 DTD 9/30/24 $303,428.00 | $14 |
| 68 | November 19, 2024 | November 12, 2024 | 7d | QT082514 #21753 302/89716H LAFAYETTE PARK, INV# 52009 DTD 09/30/24 $304,801.00 | $149,861 |
| 69 | November 19, 2024 | November 12, 2024 | 7d | QT074563 #21753 302/89716H LAFAYETTE PARK, INV# 52009 DTD 09/30/24 $304,801.00 | $98,268 |
| 70 | November 19, 2024 | November 12, 2024 | 7d | QT073995 #21753 302/89716H LAFAYETTE PARK, INV# 52009 DTD 09/30/24 $304,801.00 | $56,672 |
| 71 | December 12, 2024 | December 11, 2024 | 1d | QP003553 #21735 302/89718H BOYLE HEIGHTS SPORTS COMPLEX, INV# 52024 DTD 11/26/24 $294,416.24 | $294,416 |
| 72 | January 27, 2025 | January 23, 2025 | 4d | QP003553 #21735 302/89718H BOYLE HEIGHTS SPORTS COMPLEX INV# 52034 DTD 12/31/24 $392,075.55 | $392,076 |
| 73 | April 4, 2025 | April 1, 2025 | 3d | QP003024 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $114,928 |
| 74 | April 4, 2025 | April 1, 2025 | 3d | QP002824 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $52,429 |
| 75 | April 4, 2025 | April 1, 2025 | 3d | QP003560 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $15,227 |
| 76 | April 4, 2025 | April 1, 2025 | 3d | QP003644 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $15,227 |
| 77 | April 4, 2025 | April 1, 2025 | 3d | QP003369 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $15,140 |
| 78 | April 4, 2025 | April 1, 2025 | 3d | QP003559 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $10,453 |
| 79 | April 4, 2025 | April 1, 2025 | 3d | QP002953 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,674 |
| 80 | April 4, 2025 | April 1, 2025 | 3d | QP002981 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,674 |
| 81 | April 4, 2025 | April 1, 2025 | 3d | QP003048 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,658 |
| 82 | April 4, 2025 | April 1, 2025 | 3d | QP003632 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,613 |
| 83 | April 4, 2025 | April 1, 2025 | 3d | QP003679 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,613 |
| 84 | April 4, 2025 | April 1, 2025 | 3d | QP003678 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,613 |
| 85 | April 4, 2025 | April 1, 2025 | 3d | QP003657 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,613 |
| 86 | April 4, 2025 | April 1, 2025 | 3d | QP003276 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,598 |
| 87 | April 4, 2025 | April 1, 2025 | 3d | QP003363 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,570 |
| 88 | April 4, 2025 | April 1, 2025 | 3d | QP003475 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,559 |
| 89 | April 4, 2025 | April 1, 2025 | 3d | QP003476 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,559 |
| 90 | April 4, 2025 | April 1, 2025 | 3d | QP003523 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $7,559 |
| 91 | April 4, 2025 | April 1, 2025 | 3d | QP002229 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $6,313 |
| 92 | April 4, 2025 | April 1, 2025 | 3d | QP002066 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $1,635 |
| 93 | April 4, 2025 | April 1, 2025 | 3d | QP001250 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $810 |
| 94 | April 4, 2025 | April 1, 2025 | 3d | QP002336 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $766 |
| 95 | April 4, 2025 | April 1, 2025 | 3d | QP002697 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $746 |
| 96 | April 4, 2025 | April 1, 2025 | 3d | QP002074 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $733 |
| 97 | April 4, 2025 | April 1, 2025 | 3d | QP001348 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $655 |
| 98 | April 4, 2025 | April 1, 2025 | 3d | QP001340 #21755 302/89718H MARTIN LUTHER KING JR. RC, NTP 01/02/24 $577.80 | $578 |
| 99 | April 4, 2025 | April 1, 2025 | 3d | QP002498 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $499 |
| 100 | April 4, 2025 | April 1, 2025 | 3d | QP002310 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $462 |
| 101 | April 4, 2025 | April 1, 2025 | 3d | QP001289 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $446 |
| 102 | April 4, 2025 | April 1, 2025 | 3d | QP001354 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $441 |
| 103 | April 4, 2025 | April 1, 2025 | 3d | QP001954 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $439 |
| 104 | April 4, 2025 | April 1, 2025 | 3d | QP002039 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $439 |
| 105 | April 4, 2025 | April 1, 2025 | 3d | QP001139 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $437 |
| 106 | April 4, 2025 | April 1, 2025 | 3d | QP000930 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $435 |
| 107 | April 4, 2025 | April 1, 2025 | 3d | QP000943#21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $434 |
| 108 | April 4, 2025 | April 1, 2025 | 3d | QP000852 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $428 |
| 109 | April 4, 2025 | April 1, 2025 | 3d | QP001176 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $424 |
| 110 | April 4, 2025 | April 1, 2025 | 3d | QP001494 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $423 |
| 111 | April 4, 2025 | April 1, 2025 | 3d | QP001538 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $422 |
| 112 | April 4, 2025 | April 1, 2025 | 3d | QP000544 #21755 302/89718H MARTIN LUTHER KING JR. RC, INV# 52040 DTD 12/31/24 $333,083.78 | $410 |
| 113 | April 11, 2025 | April 10, 2025 | 1d | QP002114 #21756 302/89718H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $480,154 |
| 114 | April 11, 2025 | April 10, 2025 | 1d | QT082646 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $125,841 |
| 115 | April 11, 2025 | April 10, 2025 | 1d | #21757 302/89460K-LA LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $93,934 |
| 116 | April 11, 2025 | April 10, 2025 | 1d | #21757 302/89440K-LA LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $43,386 |
| 117 | April 11, 2025 | April 10, 2025 | 1d | QM153686 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $22,054 |
| 118 | April 11, 2025 | April 10, 2025 | 1d | QT073177 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $1,152 |
| 119 | April 11, 2025 | April 10, 2025 | 1d | QT061530 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $736 |
| 120 | April 11, 2025 | April 10, 2025 | 1d | QT074222 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $712 |
| 121 | April 11, 2025 | April 10, 2025 | 1d | QT054437 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $528 |
| 122 | April 11, 2025 | April 10, 2025 | 1d | QT074583 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $432 |
| 123 | April 11, 2025 | April 10, 2025 | 1d | QM047502 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $214 |
| 124 | April 11, 2025 | April 10, 2025 | 1d | QT073315 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $198 |
| 125 | April 11, 2025 | April 10, 2025 | 1d | QM170649 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $163 |
| 126 | April 11, 2025 | April 10, 2025 | 1d | QM197185 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $82 |
| 127 | April 11, 2025 | April 10, 2025 | 1d | QM072243 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $76 |
| 128 | April 11, 2025 | April 10, 2025 | 1d | QM064864 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $71 |
| 129 | April 11, 2025 | April 10, 2025 | 1d | QM068323 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $70 |
| 130 | April 11, 2025 | April 10, 2025 | 1d | QM151243 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $55 |
| 131 | April 11, 2025 | April 10, 2025 | 1d | QM152207 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $35 |
| 132 | April 11, 2025 | April 10, 2025 | 1d | QM180939 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $20 |
| 133 | April 11, 2025 | April 10, 2025 | 1d | QM184978 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $1 |
| 134 | April 11, 2025 | April 10, 2025 | 1d | QM195473 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $1 |
| 135 | April 11, 2025 | April 10, 2025 | 1d | QT082210 #21756 302/89716H LANARK PARK, INV# 52056 DTD 03/11/25 $769,915.00 | $1 |
| 136 | April 22, 2025 | April 15, 2025 | 7d | QP003553 #21735 302/89718H BOYLE HEIGHTS SPORTS COMPLEX INV# 52060 DTD 04/11/25 $1,418,914.36 | $1,418,914 |
| 137 | June 11, 2025 | June 9, 2025 | 2d | #21784 302/89727H-GJ GILBERT W. LINDSAY COMMUNITY CENTER, INV# 52083 DTD 06/04/25 $630,338.65 | $630,339 |
| 138 | July 8, 2025 | July 2, 2025 | 6d | #21790 302/89727H-TP TRINITY RECREATION CENTER, INV# 52081 DTD 05/30/25 $289,289.00 | $289,289 |
| 139 | July 9, 2025 | July 2, 2025 | 7d | #21785 302/89727H-GN GLASSELL PARK, INV# 52077 DTD 05/29/25 $257,980.00 | $257,980 |
| 140 | July 31, 2025 | July 29, 2025 | 2d | #21784 302/89727H-GJ GILBERT W. LINDSAY COMMUNITY CENTER, INV# 52093 DTD 7/02/25 $870,468.35 | $870,468 |