CheckbookVendor
What has the City paid Zeco Systems, Inc dba Greenlots?
$11.5M in City payments across 524 checks, from August 28, 2017 to August 22, 2022. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.
Checkbook LA · Through Sep 9, 2026
As published: ZECO SYSTEMS, INC DBA GREENLOTS
$11.5MTotal paid
524Payments
$21,942Average payment
FY2018-19Peak full year · $4.0M
By fiscal year
FY2017-18
$2.2M
FY2018-19
$4.0M
FY2019-20
$2.0M
FY2020-21
$1.6M
FY2021-22
$1.7M
FY2022-23
$9K
Who pays them
General Services$5.6M
Police$3.6M
Transportation$1.1M
Non-departmental: Appropriations to Special Purpose Fund$834K
What for
286 payments
31 payments
45 payments
9 payments
Contractual Services$763K
23 payments
Ev Charging Station Program-BSL$327K
35 payments
8 payments
St. Lighting Improvements and Supplies$193K
13 payments
53 payments
4 payments
Field Equipment Expense$8K
13 payments
Office and Administrative$2K
4 payments
Most recent payments
The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.
| Date | Budget line | Purpose | Amount |
|---|---|---|---|
| August 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | FREIGHT CHARGES | $315 |
| July 15, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | EVSE INSTALLATION, ENG./DESIGN & PROG MGMT-VARIOUS LOCATIONS | $8,755 |
| June 6, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | LABOR, INSTALLATION, ELECTRIC VEHICLE CHARGING EQUIPMENT | $13,140 |
| June 6, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | DESIGN AND SITE SURVEY - LADOT WESTERN SHOP | $4,800 |
| June 6, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | LABOR, EMER FUEL SITE EAST VALLEY - ARC FLASH CALCULATIONS | $3,500 |
| June 6, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | LABOR, EMER FUEL SITE WEST VALLEY - ARC FLASH CALCULATIONS | $3,500 |
| June 6, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | LABOR, EMERGENCY FUEL SITE SOUTH LA - ARC FLASH CALCULATIONS | $3,500 |
| June 6, 2022 | Field Equipment ExpenseGeneral Services | SERVICE TIME | $660 |
| June 6, 2022 | Field Equipment ExpenseGeneral Services | SERVICE TIME | $660 |
| June 6, 2022 | Field Equipment ExpenseGeneral Services | SERVICE TIME | $300 |
| June 6, 2022 | Field Equipment ExpenseGeneral Services | REFURBISHED CONTROL MOD | $273 |
| May 12, 2022 | Contractual ServicesPolice | B005-SKY ENTERPRISE AND SKY INSIGHTS PER L2 CHARGING PORT | $69,615 |
| May 12, 2022 | Contractual ServicesPolice | B005-SKY ENTERPRISE AND SKY INSIGHTS PER DCFC CHARGING PORT | $13,500 |
| April 25, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | C001 ENGINEER:DESIGN DRAWINGS, LOAD CALCULATION, PLAN/PERMIT | $14,838 |
| April 25, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | C001 ENGINEER: REDESIGN DRAWINGS, LOAD CALCULATION, PERMIT | $8,400 |
| April 25, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | C003 ENGINEERING: PROJECT MANAGEMENT | $500 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | C009 GATEWAY, 3704, NO ZIGBEE B00009565-1 | $4,343 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | C009 ASSY, MICROHARD CELL, 3704 | $3,935 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | C009 GFI MODULE, MOT, WGD-DIRECT DRV B00007698-8 | $3,692 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | C009 ASSY, MOTOR, BSL B00009547-1 | $2,595 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | C009 ASSY, DATA ROUTER, STATUS INDICATOR B00009279-1 | $2,135 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | C009 SERVICE ONLY, ICLASS REMOTE, UTILITY B00009625-1 | $1,899 |
| April 22, 2022 | Ev Charging Station Program-BSLNon-departmental: Appropriations to Special Purpose Fund | FREIGHT CHARGES | $500 |
| April 21, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | EVSE INSTALLATION, ENG./DESIGN & PROG MGMT-VARIOUS LOCATIONS | $6,786 |
| April 20, 2022 | Electric Vehicle Infrastructire-CitywideGeneral Services | EVSE INSTALLATION, ENG./DESIGN & PROJ MGMT- VARIOUS LOCATION | $874,035 |
Sources
LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.