CheckbookVendor

What has the City paid Socal Maintenance Pro X?

$14K in City payments across 29 checks, from September 18, 2017 to August 26, 2019. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.

Checkbook LA · Through Sep 9, 2026

As published: SOCAL MAINTENANCE PRO X

$14KTotal paid
29Payments
$478Average payment
FY2017-18Peak full year · $13K

By fiscal year

FY2017-18
$13K
FY2018-19
$480
FY2019-20
$445

Who pays them

What for

Contractual Services$9K

16 payments

Most recent payments

The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.

DateBudget linePurposeAmount
August 26, 2019Pershing Square Parking Garage OperationRecreation and ParksRELOCATION OF BICYCLE RACK TO MAIN LOBBY PARKING STRUCTURE$175
August 26, 2019Pershing Square Parking Garage OperationRecreation and ParksREPAIRS TO DOOR LOCK AND ROOM STORAGE #306$175
August 26, 2019Pershing Square Parking Garage OperationRecreation and ParksREPAIR ALUMINUM DOOR NEXT TO ADMINISTRATION OFFICE LEVEL 1$95
December 17, 2018Pershing Square Parking Garage OperationRecreation and ParksTRAFFIC DIRECTIONAL/PEDESTRIAN SIGNS INSTALLATION LEVELS 1-3$480
April 3, 2018Pershing Square Parking Garage OperationRecreation and ParksREPAIR ONE FIRE METAL DOOR NEXT TO THE STAIRWELL (OLIVE&6TH)$275
February 13, 2018Pershing Square Parking Garage OperationRecreation and ParksREPAIR TO VANDALIZED DOOR AND STORAGE ROOM #302$408
February 13, 2018Pershing Square Parking Garage OperationRecreation and ParksREINSTALL EXISTING METAL BOLLARD (VANDALIZED) ON 5TH ST EXIT$155
January 17, 2018Pershing Square Parking Garage OperationRecreation and ParksREPAIR AND REINFORCE 4 DOOR LOCKS LOCATION (P-2 LEVEL)$620
January 17, 2018Pershing Square Parking Garage OperationRecreation and ParksREPAIR AND REINFORCE FIRE DOOR LOCATION #16 STORAGES$225
November 29, 2017Contractual ServicesGeneral ServicesEXTERIOR CLEANING$450
November 27, 2017Contractual ServicesGeneral ServicesC.H.E. REPAINT 16 HANDICAP PARKING STALLS ( P-3)$720
November 27, 2017Contractual ServicesGeneral ServicesCLEAN UP AROUND PARKING STRUCTURE INC.SIDEWALKS TRASH BAGS.$710
November 27, 2017Contractual ServicesGeneral ServicesINSTALLATION OF 2 SPEED RUBBER BUMPS P-4 LEVEL$650
November 27, 2017Contractual ServicesGeneral ServicesINSTALLATION OF SPEED BUMPS BLACK AND YELLOW ( P-3 LEVEL )$650
November 27, 2017Contractual ServicesGeneral ServicesREPAINT 6 SAFETY PEDESTRIAN CROSSHATCH COLOR BLUE WIT WHITE$450
November 27, 2017Contractual ServicesGeneral ServicesREPAINT 3 SAFETY CROSSHATCH YELLOW PAINT LOCATION (P-2 )$225
November 27, 2017Contractual ServicesGeneral ServicesPAINT 6 SAFETY PARKING (CAUTION NOT A WALKWAY)$220
November 27, 2017Contractual ServicesGeneral ServicesREPAINT 6 DIRECTIONAL ARROWS COLOR YELLOW WITH TRAFFIC PAINT$165
October 12, 2017Pershing Square Parking Garage OperationRecreation and ParksREPAIR, PRIME & PAINT DAMAGE CONCRETE WALLS, CEILING 5TH ST.$975
September 25, 2017Contractual ServicesGeneral ServicesSTRIPING 100 REGULAR PARKING STALLS DOUBLE LANE WITH TRAFFIC$950
September 25, 2017Contractual ServicesGeneral ServicesPREPARATION TO STRIPE 100 REGULAR PARKING STALLS DOUBLE LANE$950
September 25, 2017Contractual ServicesGeneral ServicesPREPARATION TO BE STRIPING CROSSHATCH LANES LOCATION LOT 7 E$825
September 25, 2017Contractual ServicesGeneral ServicesPREPARATION SURFACE TO BE STRIPING 85 REGULAR PARKING STALLS$808
September 25, 2017Contractual ServicesGeneral ServicesPREPARATION TO BE STRIPING 85 REGULAR PARKING STALLS DOUBLE$808
September 25, 2017Contractual ServicesGeneral ServicesSTRIPING APRROX.220 FEET OF CENTER LANE COLOR WHITE WITH BAS$1

Sources

LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.