CheckbookVendor
What has the City paid Smithson Electric Inc?
$4.3M in City payments across 1,098 checks, from October 16, 2017 to March 10, 2026. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.
Checkbook LA · Through Sep 9, 2026
As published: SMITHSON ELECTRIC INC
$4.3MTotal paid
1,098Payments
$3,922Average payment
FY2021-22Peak full year · $917K
By fiscal year
FY2017-18
$271K
FY2018-19
$343K
FY2019-20
$647K
FY2020-21
$732K
FY2021-22
$917K
FY2022-23
$508K
FY2023-24
$410K
FY2024-25
$449K
FY2025-26
$30K
Who pays them
Transportation$4.2M
Non-departmental$105K
What for
Contractual Services$2.2M
442 payments
596 payments
44 payments
16 payments
Most recent payments
The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.
| Date | Budget line | Purpose | Amount |
|---|---|---|---|
| March 10, 2026 | Traffic Signal SuppliesTransportation | 3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE | $14,317 |
| March 10, 2026 | Traffic Signal SuppliesTransportation | 6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS | $10,040 |
| March 10, 2026 | Traffic Signal SuppliesTransportation | SERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI | $3,720 |
| March 10, 2026 | Traffic Signal SuppliesTransportation | BUS LOOPS, 0' TO 40' | $1,426 |
| March 10, 2026 | Traffic Signal SuppliesTransportation | VACUUM COST FOR EACH BUS LOOP | $136 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | 3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE | $18,294 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | 3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE | $13,522 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | 6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS | $12,222 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | 6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS | $7,421 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | SERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI | $4,666 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | BUS LOOPS, 41' TO 80' | $4,462 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | SERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI | $3,216 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | BUS LOOPS, 41' TO 80' | $2,231 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | INSTALLATION OF ENTRANCE CONDUIT TO INCLUDE MATERIAL, IN ACC | $330 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | INSTALLATION OF ENTRANCE CONDUIT TO INCLUDE MATERIAL, IN ACC | $330 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | VACUUM COST FOR EACH BUS LOOP | $272 |
| June 13, 2025 | Traffic Signal SuppliesTransportation | VACUUM COST FOR EACH BUS LOOP | $136 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | 3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE | $24,260 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | 3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE | $22,271 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | 6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS | $10,040 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | 6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS | $9,167 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | BUS LOOPS, 41' TO 80' | $8,924 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | SERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI | $5,170 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | SERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI | $4,981 |
| June 9, 2025 | Traffic Signal SuppliesTransportation | BUS LOOPS, 41' TO 80' | $2,231 |
Sources
LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.