CheckbookVendor

What has the City paid Smithson Electric Inc?

$4.3M in City payments across 1,098 checks, from October 16, 2017 to March 10, 2026. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.

Checkbook LA · Through Sep 9, 2026

As published: SMITHSON ELECTRIC INC

$4.3MTotal paid
1,098Payments
$3,922Average payment
FY2021-22Peak full year · $917K

By fiscal year

FY2017-18
$271K
FY2018-19
$343K
FY2019-20
$647K
FY2020-21
$732K
FY2021-22
$917K
FY2022-23
$508K
FY2023-24
$410K
FY2024-25
$449K
FY2025-26
$30K

Who pays them

Non-departmental$105K

What for

Contractual Services$2.2M

442 payments

596 payments

Most recent payments

The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.

DateBudget linePurposeAmount
March 10, 2026Traffic Signal SuppliesTransportation3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE$14,317
March 10, 2026Traffic Signal SuppliesTransportation6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS$10,040
March 10, 2026Traffic Signal SuppliesTransportationSERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI$3,720
March 10, 2026Traffic Signal SuppliesTransportationBUS LOOPS, 0' TO 40'$1,426
March 10, 2026Traffic Signal SuppliesTransportationVACUUM COST FOR EACH BUS LOOP$136
June 13, 2025Traffic Signal SuppliesTransportation3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE$18,294
June 13, 2025Traffic Signal SuppliesTransportation3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE$13,522
June 13, 2025Traffic Signal SuppliesTransportation6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS$12,222
June 13, 2025Traffic Signal SuppliesTransportation6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS$7,421
June 13, 2025Traffic Signal SuppliesTransportationSERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI$4,666
June 13, 2025Traffic Signal SuppliesTransportationBUS LOOPS, 41' TO 80'$4,462
June 13, 2025Traffic Signal SuppliesTransportationSERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI$3,216
June 13, 2025Traffic Signal SuppliesTransportationBUS LOOPS, 41' TO 80'$2,231
June 13, 2025Traffic Signal SuppliesTransportationINSTALLATION OF ENTRANCE CONDUIT TO INCLUDE MATERIAL, IN ACC$330
June 13, 2025Traffic Signal SuppliesTransportationINSTALLATION OF ENTRANCE CONDUIT TO INCLUDE MATERIAL, IN ACC$330
June 13, 2025Traffic Signal SuppliesTransportationVACUUM COST FOR EACH BUS LOOP$272
June 13, 2025Traffic Signal SuppliesTransportationVACUUM COST FOR EACH BUS LOOP$136
June 9, 2025Traffic Signal SuppliesTransportation3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE$24,260
June 9, 2025Traffic Signal SuppliesTransportation3" DEPTH INSTALLATION OF TRAFFIC LOOP DETECTORS, ROUND WIRE$22,271
June 9, 2025Traffic Signal SuppliesTransportation6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS$10,040
June 9, 2025Traffic Signal SuppliesTransportation6' CIRCLE BICYCLE LOOPPER ATTACHED DRAWINGS$9,167
June 9, 2025Traffic Signal SuppliesTransportationBUS LOOPS, 41' TO 80'$8,924
June 9, 2025Traffic Signal SuppliesTransportationSERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI$5,170
June 9, 2025Traffic Signal SuppliesTransportationSERVICE TO VACUUM ALL WATER AND SLURRY DURING THE INSTALLATI$4,981
June 9, 2025Traffic Signal SuppliesTransportationBUS LOOPS, 41' TO 80'$2,231

Sources

LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.