CheckbookVendor

What has the City paid Icc?

$1.6M in City payments across 338 checks, from November 29, 2017 to July 15, 2026. Outside-vendor scope only — payroll, transfers, debt and pension custody are excluded.

$1.6MTotal paid
338Payments
$4,797Average payment
FY2019-20Peak full year · $586K

By fiscal year

FY2017-18
$2K
FY2018-19
$5K
FY2019-20
$586K
FY2020-21
$79K
FY2021-22
$9K
FY2022-23
$460K
FY2023-24
$449K
FY2024-25
$19K
FY2025-26
$6K
FY2026-27 *
$7K

Who pays them

What for

Office and Administrative$51K

57 payments

Maintenance Materials, Supplies & Services$10K

7 payments

Contractual Services$7K

6 payments

5 payments

Operating Supplies$304

2 payments

* FY2026-27 is still in progress — $7K so far, not a full year. Same point of FY2025-26 (payments dated through Sep 9, 2025): $1K.

Most recent payments

The 25 latest to post. Purpose strings are the Controller's own reference codes — the budget line in the second column is usually the more informative field.

DateBudget linePurposeAmount
July 15, 2026Building and Safety TrainingBuilding and SafetyAISC STEEL CONSTRUCTION MANUAL 16TH ED$3,073
July 15, 2026Building and Safety TrainingBuilding and SafetyASCE 7-22 MINIMUM DESIGN LOADS$1,531
July 15, 2026Building and Safety TrainingBuilding and SafetyTMS 402/602 - 22 BLDG CODE RQRMNTS & SPECS MASONRY STCRS$988
July 15, 2026Building and Safety TrainingBuilding and SafetySEISMIC EVALUATION & RETROFIT OF EXISTING BLDG$586
July 15, 2026Building and Safety TrainingBuilding and SafetySEISMIC DESIGN MANUAL, 4TH EDITION$494
July 15, 2026Building and Safety TrainingBuilding and SafetyFREIGHT/S&H$137
February 25, 2026Building and Safety TrainingBuilding and Safety'24 IRC COMMENTARY COMBO (VOL. 1 &2) SC & PD$421
February 25, 2026Building and Safety TrainingBuilding and Safety'26 NEC HANDBOOK & TAB COMBO$325
February 25, 2026Building and Safety TrainingBuilding and Safety'24 IRC (SOFTCOVER & PDF REDLINE DOWNLOAD$216
February 25, 2026Building and Safety TrainingBuilding and Safety'24 ISPSC (SC & PDF/REDLINE DOWNLOAD)$120
February 25, 2026Building and Safety TrainingBuilding and Safety'24 IRC STUDY COMPANION$75
February 25, 2026Building and Safety TrainingBuilding and Safety'24 IRC STUDY COMPANION PDF$58
February 25, 2026Building and Safety TrainingBuilding and SafetySHIPPING / DELIVERY CHARGES$57
February 23, 2026Building and Safety Expense and EquipmentBuilding and Safety'16 MSJC BUILDING CODE REQUIREMENTS$148
February 23, 2026Building and Safety Expense and EquipmentBuilding and SafetyBLDG CODES ILLUSTRATED 8TH ED$76
February 23, 2026Building and Safety Expense and EquipmentBuilding and SafetyFREIGHT/S&H$35
January 26, 2026Building and Safety Expense and EquipmentBuilding and SafetyASCE/SEI 7-22 MINIMUM DESIGN LOADS & ASSOC$279
January 26, 2026Building and Safety Expense and EquipmentBuilding and SafetyEC - ANSI MH16.1-2021 DESIGN, TESTING & UTILIZ$135
January 26, 2026Building and Safety Expense and EquipmentBuilding and SafetyEC - MH16.3-2016-SPEC FOR CANTILEVERED STO$135
November 25, 2025Building and Safety Expense and EquipmentBuilding and Safety'25 CALIFORNIA ELECTRICAL CODE$593
November 25, 2025Building and Safety Expense and EquipmentBuilding and Safety'25 CALIFORNIA MECHANICAL CODE$426
November 25, 2025Building and Safety Expense and EquipmentBuilding and Safety'25 CALIFORNIA PLUMBING CODE$426
November 25, 2025Building and Safety Expense and EquipmentBuilding and SafetyFREIGHT/S&H$79
November 17, 2025Building and Safety Expense and EquipmentBuilding and Safety'25 SIG CHANGES TO CA BLDG CODE$47
November 17, 2025Building and Safety Expense and EquipmentBuilding and Safety'25 SIG CHANGES TO CA RESIDENTIAL CODE$47

Sources

LA Controller, Checkbook LA (dataset pggv-e4fn), totalled nightly. Figures are every payment on record within the outside-vendor scope, not a single fiscal year. Back to the checkbook.