SpendingContractsPurchase order

What has the City paid on purchase order SC50CO13121862M?

$8.45M paid to HNTB Corporation across 126 payments from July 21, 2017 to October 9, 2024, charged to Non-Departmental / 6th St Design Con-Constr PH.

What it was for

6th St Design Con-Constr PH

Budget line carrying the most money, of 7 this order is charged to.

Approval records

No council file, contract number or payment authority appears in this order's checkbook records.

Paid from

Sixth Street Viaduct Improvement Fund

restricted revenue (grants, fees or a dedicated tax) that can only be spent on this purpose — not general-fund tax dollars.

Department: Non-Departmental

Every payment, in order

Payment requests are numbered sequentially by the City, so the order here is the order they were approved. Several requests clearing on one day usually means invoices were held and released together.

#PaidInvoicedLagReferenceAmount
1July 21, 2017February 16, 2017155dPR# 46 FROM F608/50S703 WO# E700224A - 6TH ST PROJECT$7,658
2July 25, 2017February 16, 2017159dPR# 46 WO# E700229F FROM F54W/50JRD3 - 6TH ST. PROJECT$153,785
3July 25, 2017March 16, 2017131dPR# 47 FROM F54W/50JRD3 WO# E700224F$86,410
4July 25, 2017February 16, 2017159dPR# 46 WO# E700224A FROM F54W/50JRD1 -6TH ST. PROJECT$85,031
5July 25, 2017March 16, 2017131dPR# 47 FROM F54W/50JRD3 WO# E700229F$75,177
6July 25, 2017February 16, 2017159dPR# 46 WO# E700224F FROM F54W/50JRD3 - 6TH ST. PROJECT$18,569
7July 25, 2017March 16, 2017131dPR# 47 FROM F54W/50JRD3 WO# E700226F$5,490
8July 27, 2017April 24, 201794dENCUMBER HNTB PR# 48 WO# E700224A FROM F608/50S703 -6TH ST PROJECT$1,565
9August 2, 2017April 24, 2017100dPR#48 WO# E700229F FROM F54W/50JRD3 - 6TH ST. PROJECT$199,521
10August 2, 2017May 18, 201776dPR#49 WO# E700224F FROM F54W/50JRD3 - 6TH ST. PROJECT$104,979
11August 2, 2017May 18, 201776dPR#49 WO# E700229F FROM F54W/50JRD3 - 6TH ST. PROJECT$90,212
12August 2, 2017April 24, 2017100dPR#48 WO# E700224A FROM F54W/50JRD1 - 6TH ST. PROJECT$12,077
13August 2, 2017April 24, 2017100dPR#48 WO# E700224L FROM F54W/50JRD2 - 6TH ST. PROJECT$6,943
14August 2, 2017May 18, 201776dPR#49 WO# E700226F FROM F54W/50JRD3 - 6TH ST. PROJECT$5,490
15August 2, 2017April 24, 2017100dPR#48 WO# E700227F FROM F54W/50JRD3 - 6TH ST. PROJECT$3,500
16October 17, 2017July 27, 201782dPR# 51 FROM F54W/50JRD3 WO# E700224F 6TH ST. PROJECT$148,551
17October 17, 2017September 21, 201726dPR# 50 FROM F54W/50JRD3 WO# E700229F 6TH ST. PROJECT$115,835
18October 17, 2017August 17, 201761dPR# 52 FROM F54W/50JRD3 WO# E700224F 6TH ST. PROJECT$111,413
19October 17, 2017August 17, 201761dPR# 53 FROM F54W/50JRD3 WO# E700224F 6TH ST. PROJECT$103,986
20October 17, 2017August 17, 201761dPR# 52 FROM F54W/50JRD3 WO# E700229F 6TH ST. PROJECT$99,603
21October 17, 2017July 27, 201782dPR# 51 FROM F54W/50JRD3 WO# E700229F 6TH ST. PROJECT$79,443
22October 17, 2017September 21, 201726dPR# 50 FROM F54W/50JRD3 WO# E700224F 6TH ST. PROJECT$79,325
23October 17, 2017August 17, 201761dPR# 53 FROM F54W/50JRD3 WO# E700229F 6TH ST. PROJECT$54,159
24October 17, 2017September 21, 201726dPR# 50 FROM F54W/50JRD2 WO# E700224L 6TH ST. PROJECT$5,903
25March 6, 2018October 23, 2017134dPR# 54 INV. # 58942-DS-001-0054 FROM F54W/50JRD3 WO# E700224F -6TH ST. PROJECT$97,253
26March 6, 2018November 14, 2017112dPR# 55 INV. # 58942-DS-001-0055 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT$69,921
27March 6, 2018October 23, 2017134dPR# 54 INV. # 58942-DS-001-0054 FROM F54W/50JRD3 WO# E700229F -6TH ST. PROJECT$61,006
28March 6, 2018November 14, 2017112dPR# 55 INV. # 58942-DS-001-0055 FROM F54W/50JRD3 WO# E700229F - 6TH ST. PROJECT$58,983
29May 31, 2018December 12, 2017170dPR# 56 INV.# 58942-DS-001-0056 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT$100,272
30May 31, 2018December 12, 2017170dPR# 56 INV.# 58942-DS-001-0056 FROM F54W/50JRD3 WO# E700229F - 6TH ST. PROJECT$17,725
31July 5, 2018January 17, 2018169dPR#57 INV.# 58942-DS-001-0057 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT$133,696
32July 5, 2018January 17, 2018169dPR#57 INV.# 58942-DS-001-0057 FROM F54W/50JRD3 WO# E700229F - 6TH ST. PROJECT$31,692
33July 27, 2018February 15, 2018162dHNTB PR# 58 INV.# 58942-DS-001-0058 FROM F54W/50JRD1 WO# E700224A - 6TH ST. PROJECT$164
34July 30, 2018February 15, 2018165dPR#58 INV. # 58942-DS-001-0058 FROM F54W/50JRD3 WO#E700224F - 6TH ST. PKG5$92,844
35July 30, 2018February 15, 2018165dPR#58 INV. # 58942-DS-001-0058 FROM F54W/50JRD3 WO#E700229F - 6TH ST. PKG 4$43,003
36July 30, 2018February 15, 2018165dPR#58 INV. # 58942-DS-001-0058 FROM F54W/50JRD1 WO#E700224A - 6TH ST. PE-DES$13,154
37August 20, 2018May 21, 201891dPAYMENT FOR PR#61 INV. # 58942-DS-001-0061 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$118,915
38August 20, 2018April 16, 2018126dPAYMENT FOR PR#60 INV. # 58942-DS-001-0060 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$116,462
39August 20, 2018March 29, 2018144dPAYMENT FOR PR#59 INV. # 58942-DS-001-0059 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$103,986
40August 20, 2018April 16, 2018126dPAYMENT FOR PR#60 INV. # 58942-DS-001-0060 FROM F54W/50JRD3 WO# E700229F - 6TH ST. PROJECT PKG 4$22,553
41August 20, 2018March 29, 2018144dPAYMENT FOR PR#59 INV. # 58942-DS-001-0059 FROM F54W/50JRD3 WO# E700229F - 6TH ST. PROJECT PKG 4$10,208
42November 8, 2018September 10, 201859dPAYMENT FOR PR#65 INV. # 58942-DS-001-0065 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$220,454
43November 8, 2018August 23, 201877dPAYMENT FOR PR#64 INV. # 58942-DS-001-0064 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$195,000
44November 8, 2018June 13, 2018148dPAYMENT FOR PR#62 INV.# 58942-DS-001-0062 FROM WO# F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$148,477
45November 8, 2018July 12, 2018119dPAYMENT FOR PR#63 INV.# 58942-DS-001-0063 FROM F54W/50JRD3 WO# E700224F - 6TH ST. PROJECT PKG 5$145,326
46November 8, 2018June 13, 2018148dPAYMENT FOR PR#62 INV.# 58942-DS-001-0062 FROM F54W/50JRD1 WO# E700224A - 6TH ST. PROJECT PE-DES$2,972
47January 14, 2019November 19, 201856dPAYMENT FOR PR#67 INV.#58942-DS-001-0067 FROM F54W/50JRD3 WO#E700224F - 6TH ST. PROJECT.$286,850
48January 14, 2019October 16, 201890dPAYMENT FOR PR#66 INV.#58942-DS-001-0066 FROM F54W/50JRD3 WO#E700224F - 6TH ST. PROJECT.$278,533
49April 4, 2019December 17, 2017473dHNTB PR# 68 WO# E700224A FROM F608/50S703 -6TH ST PROJECT$3,534
50April 4, 2019January 17, 201977dHNTB PR# 69 WO# E700224A FROM F608/50S703 -6TH ST PROJECT$1,151
51April 8, 2019December 17, 2018112dPAYMENT FOR PR#68 INV # 58942-DS-001-0068 FROM 54W/50JRD3 WO# E700224F 6TH ST$141,265
52April 8, 2019February 14, 201953dPAYMENT FOR PR#70 INV# 58942-DS-001-0070 FROM 54W/50JRD3 WO# E700224F 6TH ST PROJECT$115,127
53April 8, 2019January 17, 201981dPAYMENT FOR PR#69 INV# 58942-DS-001-0069 FROM 54W/50JRD3 WO# E700224F 6TH ST PROJECT$113,129
54April 8, 2019December 17, 2018112dPAYMENT FOR PR#68 INV # 58942-DS-001-0068 FROM 54W/50JRD1 WO# E700224A 6TH ST$27,273
55April 8, 2019December 17, 2018112dPAYMENT FOR PR#68 INV # 58942-DS-001-0068 FROM 54W/50JRD2 WO# E700224L 6TH ST$21,882
56April 8, 2019January 17, 201981dPAYMENT FOR PR#69 INV# 58942-DS-001-0069 FROM 54W/50JRD1 WO# E700224A 6TH ST PROJECT$8,883
57September 23, 2019April 30, 2019146dPAYMENT FOR PR#72 INV# 58942-DS-001-0072 FROM 54W/50JRD3 WO#E700224F/226F 6TH ST. PROJECT$189,886
58September 23, 2019April 4, 2019172dPAYMENT FOR PR#71 INV# 58942-DS-001-0071 FROM 54W/50JRD3 WO#E700224F 6TH ST. PROJECT$123,368
59September 23, 2019May 23, 2019123dPAYMENT FOR PR#73 INV# 58942-DS-001-0073 FROM 54W/50JRD3 WO#E700224F 6TH ST. PROJECT$116,501
60September 23, 2019April 30, 2019146dPAYMENT FOR PR#72 INV# 58942-DS-001-0072 FROM 54W/50JRD3 WO#E700224F/226F 6TH ST. PROJECT$16,470
61September 22, 2020August 18, 202035dPAYMENT FOR HNTB PR#78R2 TO SSV-001 INV.#58942-DS-001/CN-001/CN-002-0078R2 FROM F298/50RSIX E700224F$701,532
62September 22, 2020August 18, 202035dPAYMENT FOR HNTB PR#79R2 TO SSV-001 INV.#58942-DS-001/CN-001/CN-002-0079R2 FROM F298/50RSIX E700224F$64,575
63September 24, 2020August 18, 202037dPMNT FOR HNTB PR#78R2 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0078R2 FROM F54W/50JRD3 -E700227F$30,987
64October 2, 2020September 22, 202010dPAYMENT FOR HNTB PR#80R1 TO SSV-001 INV.#58942-DS-001/CN-001/CN-002-0080R1 FROM F298/50RSIX E700224F$61,462
65November 4, 2020October 21, 202014dPAYMENT FOR HNTB PR#81R1 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0081R1 FR. F298/50RSIX E700224F$78,972
66December 2, 2020November 17, 202015dPAYMENT FOR HNTB PR#82 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0082 FROM F298/50RSIX WO#E700224F$69,284
67January 14, 2021December 17, 202028dPAYMENT FOR HNTB PR#83 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0083 FROM F54W/50JRD3 WO#E700226F$27,450
68January 14, 2021December 17, 202028dPAYMENT FOR HNTB PR#83 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0083 FROM F54W/50JRD3 WO#E700224F$20,413
69January 14, 2021December 17, 202028dPAYMENT FOR HNTB PR#83 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0083 FROM F54W/50JRD1 WO#E700224A$7,857
70January 15, 2021December 17, 202029dPAYMENT FOR HNTB PR#83 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0083 FROM F298/50RSIX WO#E700224F$69,503
71January 15, 2021December 17, 202029dPAYMENT FOR HNTB PR#83 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002-0083 FROM F298/50R704 E700224A$1,018
72May 28, 2021April 28, 202130dPAYMENT HNTB PR#87 TOS SSV-001 INV. #58942-DS-001/CN-001/CN-002-0087 FR F298/50RSIX WO#E700224F$87,511
73May 28, 2021April 28, 202130dPAY HNTB PR#88 TOS SSV-001 INV #58942-DS-001/CN-001/CN-002/CN-004/CN-005-88 FR F298/50SRSC #E700224F$79,889
74May 28, 2021April 28, 202130dPAYMENT HNTB PR#85R TOS SSV-001 INV. #58942-DS-001/CN-001/CN-002-0085R FR F298/50RSIX WO#E700224F$76,682
75May 28, 2021April 28, 202130dPAYMENT HNTB PR#86 TOS SSV-001 INV. #58942-DS-001/CN-001/CN-002-0086 FR F298/50RSIX WO#E700224F$69,134
76August 3, 2021July 21, 202113dPAY HNTB PR#89R TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-89R FR F298/50SRSC E700224F$64,278
77August 3, 2021July 21, 202113dPAYMENT FOR HNTB PR#89R TO SSV-001 INV. #58942-DS-001/CN-001/CN-002/CN-004/CN-005-89R FR F54W/50JRD3$10,118
78August 9, 2021July 21, 202119dPAY HNTB PR#90R TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-90 FR F298/50SRSC E700224F$75,706
79October 5, 2021September 8, 202127dPYMNT HNTB PR# 84R_1 TO SSV-001 INV# 58942-DS-001/CN-001/CN-002/CN-004/CN-005-84R_1 FR F54W/50JRD1$81,174
80October 5, 2021September 8, 202127dPYMNT HNTB PR# 84R_1 TO SSV-001 INV# 58942-DS-001/CN-001/CN-002/CN-004/CN-005-84R_1 FR F54W/50JRD2$30,923
81October 5, 2021September 8, 202127dPAYMENT NTB PR# 84R_1 TO SSV-001 INV# 58942-DS-001/CN-001/CN-002/CN-004/CN-005-84R_1 FR F298/50R704$10,291
82November 2, 2021October 18, 202115dPAYMENT FOR HNTB PR#92R TO SSV-001 INV. #58942-DS-001/CN-001/CN-002/CN-004/CN-005-92R FR F54W/50JRD3$5,059
83November 5, 2021October 18, 202118dPAY HNTB PR#91R TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-91R FR F298/50SRSC E700224F$90,317
84November 5, 2021October 18, 202118dPAY HNTB PR#93 TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-93 FR F298/50SRSC E700224F$72,680
85November 5, 2021October 18, 202118dPAY HNTB PR#92R TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-92R FR F298/50SRSC E700224F$70,418
86November 23, 2021November 4, 202119dPAY HNTB PR#94 TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-94 FR F298/50SRSC E700224F$90,791
87November 23, 2021November 4, 202119dPAY HNTB PR#95 TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-95 FR F298/50SRSC E700224F$77,522
88January 10, 2022December 20, 202121dPAYMENT FOR HNTB PR#96 TO SSV-001 INV. #58942-DS-001/CN-001/CN-002/CN-004/CN-005-96 FR F54W/50JRD3$12,589
89January 11, 2022December 20, 202122dPAY HNTB PR#96 TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-96 FR F298/50SRSC E700224F$78,278
90February 14, 2022February 1, 202213dPAY HNTB PR#97 TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-97 FR F298/50SRSC E700224F$105,805
91June 1, 2022May 12, 202220dPMNT FOR HNTB PR#98 TOS SSV-001 INV#58942-DS-001/CN-001/CN-002/CN-004/CN-005-98 FR. F298/50SRSC- 6TH$77,450
92June 20, 2022May 12, 202239dPMNT FOR HNTB PR#100 TOS SSV-001 INV. #58942-DS-001/CN-001/CN-002/CN-004/CN-005-100 FR. F298/50SRSC$95,871
93June 20, 2022May 12, 202239dPAYMENT FOR HNTB PR#99 TOS SSV-001 INV. #58942-DS-001/CN-001/CN-002/CN-004/CN-005-99 FROM F298/50SRS$83,001
94June 20, 2022May 12, 202239dPAYMENT FOR HNTB PR#99 TOS SSV-001 INV. #58942-DS-001/CN-001/CN-002/CN-004/CN-005-99 FR. F54W/50JRD1$23,777
95July 25, 2022June 20, 202235dPAYMENT FOR HNTB PR#101R TOS SSV-001 INV. #58942-DS-001/CN-001/CN-004/CN-005-101R FROM F298/50SRSC$71,907
96December 12, 2022October 21, 202252dPAYMENT HNTB PR#102R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005 FROM F298/50SRSC WO#E700224F$74,475
97December 12, 2022October 21, 202252dPAY HNTB PR#102R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005 FR F298/50RSIX WO#E700224F$18,310
98December 19, 2022October 21, 202259dPAY HNTB PR#103R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005-103R FR 298/50SRSC WO #E700224F$80,813
99December 19, 2022October 21, 202259dPAY HNTB PR#103R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005-103R FR 298/50RSIX WO #E700224F$8,230
100December 23, 2022October 21, 202263dPAY FOR HNTB PR#102R SSV-01 INV #58942-CN-001/CN-003/CN-004/CN-005-102R FR F54W/50JRD3 WO#E7000224F$2,235
101January 27, 2023October 21, 202298dPAY HNTB PR104R TOS SSV-001 INV #58942-CN-001/CN-004/CN-005-104R FROM 298 50SRSC WO #E700224F$70,014
102March 14, 2023March 11, 2022368dPAYMENT FOR HNTB PR# 99 CORRECTION-F298/50R704 WO#E700224A -6TH ST.$3,081
103March 24, 2023October 17, 2022158dPAYMENT FOR HNTB PR#103R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-103R FROM F54W/50JRD3$26,341
104March 24, 2023October 17, 2022158dPAYMENT FOR HNTB PR#103R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-103R FROM F54W/50JRD3$2,368
105April 3, 2023October 17, 2022168dPAYMENT FOR HNTB PR#104R TO SSV-001 INV. #58942-CN-001/CN-004/CN-005-104R FROM F54W/50JRD3$6,924
106April 19, 2023October 17, 2022184dPAYMENT FOR HNTB PR#105R TO SSV-001 INV. #58942-CN-001/CN-004/CN-005-0105R FROM F54W/50JRD3$17,562
107April 28, 2023October 17, 2022193dPAY HNTB PR105R TOS SSV-001 INV #58942-CN-001/CN-004/CN-005-0105R FROM 298 50RSIX WO #E700224F$56,526
108April 28, 2023October 17, 2022193dPAYMENT FOR HNTB PR#106 TO SSV-001 INV. #58942-CN-001/CN-004/CN-005-0106 FROM F54W/50JRD3$51,913
109May 8, 2023October 17, 2022203dPAY HNTB PR106 TOS SSV-001 INV #58942-CN-001/CN-004/CN-005-0106 FROM 298 50RSIX WO #E700224F$36,908
110February 15, 2024December 4, 202373dPAY HNTB PR111R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005-111R FROM 298 50SRSC WO #E700224F$20,739
111February 15, 2024December 4, 202373dPAY HNTB PR112R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005-112R FROM 298 50SRSC WO #E700224F$10,611
112February 15, 2024December 4, 202373dPAY HNTB PR107R TOS SSV-001 INV #58942-CN-001/CN-004/CN-005-107R FROM 298 50SRSC WO #E700224F$5,181
113February 15, 2024December 4, 202373dPAY HNTB PR108R TOS SSV-001 INV #58942-CN-001/CN-004/CN-005-108R FROM 298 50SRSC WO #E700224F$4,847
114February 15, 2024December 4, 202373dPAY HNTB PR109R TOS SSV-001 INV #58942-CN-001/CN-004/CN-005-109R FROM 298 50SRSC WO #E700224F$4,839
115February 15, 2024December 4, 202373dPAY HNTB PR110R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005-110R FROM 298 50SRSC WO #E700224F$4
116February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR#109R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-109R WO#E700224F$71,623
117February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR#108R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-108R WO#E700224F$64,605
118February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR#107R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-107R WO#E700224F$64,142
119February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR#110R TO SSV-001 INV#58942-CN-001/CN-003/CN-004/CN-005-110R F54W/50JRD3$47,894
120February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR#111R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-111R WO#E700224F$10,222
121February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR107R FROM 298/50RSIX WO#E700224F-6TH ST. PROJ$7,229
122February 23, 2024December 4, 202381dPAYMENT FOR HNTB PR108R FROM 298/50RSIX WO#E700224F-6TH ST. PROJ$87
123October 7, 2024September 16, 202421dPAY HNTB PR113R TOS SSV-001 INV #58942-CN-001/CN-003/CN-004/CN-005-113R FROM 298 50SRSC WO #E700224F$43,284
124October 9, 2024September 16, 202423dPAYMENT FOR HNTB PR#113R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-113R WO#E700229F$30,071
125October 9, 2024September 16, 202423dPAYMENT FOR HNTB PR#113R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-113R WO#E700226F$20,267
126October 9, 2024September 16, 202423dPAYMENT FOR HNTB PR#113R TO SSV-001 INV. #58942-CN-001/CN-003/CN-004/CN-005-113R WO#E700227F$10,057

Download this table: ·

Draw-down shape

Sources

LA Controller, Checkbook LA (pggv-e4fn), read live and grouped by po_num, which is populated on about 90% of payments. Council files link to the City Clerk's Council File Management System. The City's biggest contracts · The checkbook.