SpendingContractsPurchase order

What has the City paid on purchase order CPO70240000481579?

$52K paid to Knoll Inc across 53 payments from October 25, 2024 to December 6, 2024, charged to Police / Dna Capacity Enchancement Prog.

What it was for

Dna Capacity Enchancement Prog

Budget line.

Approval records

No council file, contract number or payment authority appears in this order's checkbook records.

Paid from

Police Department Grant

restricted revenue (grants, fees or a dedicated tax) that can only be spent on this purpose — not general-fund tax dollars.

Department: Police

Every payment, in order

Payment requests are numbered sequentially by the City, so the order here is the order they were approved. Several requests clearing on one day usually means invoices were held and released together.

#PaidInvoicedLagReferenceAmount
1October 25, 2024July 2, 2024115dFLOORSTANDING PEDESTAL, SERIES 2 STEEL FRONT, BOX/BOX/FILE$1,835
2October 25, 2024July 2, 2024115dPRECONFIGURED PANEL, TOPWAY, MONOLITHIC MONOLITHIC, FABRIC T$1,834
3October 25, 2024July 2, 2024115dLED TASK LIGHT, 44WX2D, FOR USE WITH 48" AND WIDER OVERHEA$1,770
4October 25, 2024July 2, 2024115dPRECONFIGURED PANEL, TOPWAY, MONOLITHIC MONOLITHIC, FABRIC T$1,405
5October 25, 2024July 2, 2024115d"HORIZON OVERHEAD CABINET WITH STEEL FLIP-UP DOOR, 48W, WITH$1,145
6October 25, 2024July 2, 2024115dPANEL POWER MODULE, 3+1, 48" PANEL$828
7October 25, 2024July 2, 2024115dPRECONFIGURED PANEL, TOPWAY, MONOLITHIC MONOLITHIC, FABRIC T$378
8October 25, 2024July 2, 2024115d"PANEL POWER CONNECTOR, 3+1, 12" NO POST"$362
9October 25, 2024July 2, 2024115dPANEL POWER CONNECTOR, 3+1, 15" W/POST"$347
10October 25, 2024July 2, 2024115dWORKSURFACE, CURVILINEAR CORNER "L" SHAPE, 72X48X30X24, N$267
11October 25, 2024July 2, 2024115d"UNIVERSAL POST COMPONENT, 64H, POST ONLY, HORIZON"$257
12October 25, 2024July 2, 2024115d"BASE POWER INFEED, 3+1, 144" (REVERSIBLE)"$257
13October 25, 2024July 2, 2024115d"WORKSURFACE, RECTANGULAR, 72WX24D, NO GROMMET"$254
14October 25, 2024July 2, 2024115dPRECONFIGURED PANEL, TOPWAY, MONOLITHIC MONOLITHIC, FABRIC T$225
15October 25, 2024July 2, 2024115d"HORIZON OVERHEAD CABINET WITH STEEL FLIP-UP DOOR, 30W, WITH$212
16October 25, 2024July 2, 2024115dFABRIC TILE, 48W, FOR 64H PANEL$200
17October 25, 2024July 2, 2024115dPRECONFIGURED PANEL, TOPWAY, MONOLITHIC MONOLITHIC, FABRIC T$197
18October 25, 2024July 2, 2024115dDUPLEX CIRCUIT 2 - SINGLE PACK$195
19October 25, 2024July 2, 2024115dDUPLEX CIRCUIT 1 - SINGLE PACK$169
20October 25, 2024July 2, 2024115d"LED TASK LIGHT, 17WX2D, FOR USE WITH 24" AND WIDER OVERHEA$163
21October 25, 2024July 2, 2024115dPANEL END ASSEMBLY, 42H, METAL FLAT"$127
22October 25, 2024July 2, 2024115d"PANEL BASE RACEWAY, NO KNOCKOUTS, 48W"$127
23October 25, 2024July 2, 2024115dPENCIL TRAY, BLACK$106
24October 25, 2024July 2, 2024115dDUPLEX CIRCUIT 3 - SINGLE PACK$104
25October 25, 2024July 2, 2024115d"PANEL BASE RACEWAY, NO KNOCKOUTS, 24W"$100
26October 25, 2024July 2, 2024115dPOST COVER, STRAIGHT, 64H, HORIZON$98
27October 25, 2024July 2, 2024115d"WORKSURFACE, RECTANGULAR, 48WX24D, NO GROMMET"$96
28October 25, 2024July 2, 2024115dFABRIC TILE, 48W, FOR 42H PANEL$74
29October 25, 2024July 2, 2024115dEDGEBAND 2MMX35MM FOLKSTONE GREY #114 (PRICED PER FOOT)$74
30October 25, 2024July 2, 2024115d"CANTILEVER BRACKET, RIGHT, 18"D, SINGLE PACK"$66
31October 25, 2024July 2, 2024115d"CANTILEVER BRACKET, LEFT, 18"D, SINGLE PACK"$66
32October 25, 2024July 2, 2024115dPANEL POWER JUMPER, 3+1, 18" PANEL, (WITH POST)$60
33October 25, 2024July 2, 2024115dPOST COVER, CORNER, 64H, HORIZON$58
34October 25, 2024July 2, 2024115dFLAT BRACKET 24" - SINGLE PACK$47
35October 25, 2024July 2, 2024115dPANEL POWER MODULE, 3+1, 36" PANEL$41
36October 25, 2024July 2, 2024115dPANEL POWER MODULE, 3+1, 30" PANEL$39
37October 25, 2024July 2, 2024115d"POST COVER, HI-LO LEFT HAND, 21H, HORIZON"$38
38October 25, 2024July 2, 2024115d"POST COVER, HI-LO RIGHT HAND, 21H, HORIZON"$38
39October 25, 2024July 2, 2024115d"POST COVER, HI-LO STRAIGHT, 21H, HORIZON"$38
40October 25, 2024July 2, 2024115d"PANEL-TO-PANEL TOP CAP TRANSITION, USED WITH METAL FLAT - 1$35
41October 25, 2024July 2, 2024115d"UNIVERSAL POST COMPONENT, 42H, POST ONLY, HORIZON"$26
42October 25, 2024July 2, 2024115dPANEL TO PANEL CONNECTOR, HIGH-LOW$25
43October 25, 2024July 2, 2024115dPOST COVER, STRAIGHT, 42H, HORIZON$17
44October 25, 2024July 2, 2024115dPOST TOP CAP ASSEMBLY ONE WAY, HORIZON, METAL FLAT, UNIVERSA$11
45October 25, 2024July 2, 2024115dCHANGE KEY$10
46October 25, 2024July 2, 2024115dPANEL-TO-WORKSURFACE BRACKET, RIGHT$8
47October 25, 2024July 2, 2024115dPANEL-TO-WORKSURFACE BRACKET, LEFT$8
48October 25, 2024July 2, 2024115dPOST TOP CAP ASSEMBLY INLINE, HORIZON, METAL FLAT, UNIVERSAL$4
49October 25, 2024July 2, 2024115dPOST TOP CAP ASSEMBLY THREE WAY, HORIZON, METAL FLAT, UNIVER$2
50November 27, 2024November 12, 202415dUNIVERSAL TEXTURED FINISH LACQUER PAINT, 12 OZ SPRAY, SLATE/$51
51November 27, 2024November 12, 202415dUNIVERSAL SMOOTH FINISH LACQUER PAINT, (2) 1 OZ BOTTLES, SLA$22
52December 6, 2024November 12, 202424dASSEMBLY SERVICES$34,071
53December 6, 2024November 12, 202424dPROJECT MANAGEMENT$3,577

Download this table: ·

Draw-down shape

Sources

LA Controller, Checkbook LA (pggv-e4fn), read live and grouped by po_num, which is populated on about 90% of payments. Council files link to the City Clerk's Council File Management System. The City's biggest contracts · The checkbook.