LA receipts
Snapshot
About
LA receipts

Follow every dollar in Los Angeles. Built with public data from the City of LA.

Methodology & sources

Budget

  • 2026-27 Budget
  • Past Budgets
  • Revenue

Spending

  • Checkbook
  • Payroll
  • Deep Dives

Issues

  • Homelessness
  • LAHSA X-Ray
  • Housing
  • Path to 30,000
  • Safety
  • 311

Data Sources

  • LA Controller ↗
  • LA Open Data ↗
  • LAHSA ↗

All data sourced from public records under Creative Commons Attribution license.

© 2026 LA Receipts

Housing policy

The Path to 30,000.

Los Angeles permits about 17,000 homes a year. The state asks for 57,000. Here is the architecture of the gap — and the realistic target a serious housing platform can credibly aim at.

The gap

LA must plan for 456,643 homes by 2029.

The state does not ask LA to actually build them — only to plan and zone for them. But the math of either path is the same. To hit the eight-year target, the city would need to permit about 57,000 homes a year. In 2024 it permitted 17,217.

That is not a money problem. It is an architecture problem.

456,643Units LA must plan forby October 2029
17,217Permitted in 2024including 7,049 ADUs
57,080Annual pace requiredto hit the 2029 target
~30%Share of pace LA hitin 2024
Permit history

LA City housing permits, 1980–2024


Why building stopped

Five things compound every project.

None of these is the single villain. Together, they explain why the numbers look the way they do — and which levers actually move them.

01The 18-month grind
~18 monthsaverage permit time

If you want to build an apartment building in Los Angeles, the city has no deadline to act on your paperwork. Different departments contradict each other. Inspectors change requirements halfway through. By the time approval lands, interest rates have moved and the project may not pencil anymore.

02Measure ULA
4–5.5%tax on transfers above $5.3M

Most LA properties that sell above $5.3 million aren't mansions — they're apartment buildings, commercial parcels, and the land developers buy to build new housing on. RAND estimates the tax suppresses about 1,900 new units per year, including 160 affordable units that would have been built under density bonuses.

03The replacement rule
624,000rent-stabilized units

When a developer wants to tear down a small old building to build a bigger newer one, the law requires every old unit to be replaced as permanently affordable at the original low rent. Forever. Most projects don't pencil under that rule, so the small old buildings just sit there.

04Two times Texas
~2×construction cost vs. Texas

RAND finds LA development costs are roughly twice what Texas builders pay. Union wages, material costs, building-code requirements, and city fees of $40,000–$90,000 per unit add up. Even with perfect permits, a lot of LA projects wouldn't pencil.

05The subsidy gap
~10×affordable funding shortfall

Affordable housing requires roughly $200,000–$400,000 in public subsidy per apartment. LA's annual need to hit its state-required affordable share is on the order of $7 billion. Available funding is closer to $700 million. There is no plan to close that gap.


The path

Three categories of reform, seventeen levers.

The path does not invent a new theory of housing. It executes reforms most California cities have already done, plus a handful LA has uniquely failed to adopt. Grouped by what they actually fix:

Process.

Make permits move
60/120-day shot clock

60 days for zoning-compliant projects, 120 days for discretionary ones.

Fixes: The 18-month average grind that kills projects in queue.

Single-inspector model

One inspector from pre-construction through final occupancy.

Fixes: Inspectors changing requirements mid-project and contradicting each other.

Self-certification for simple projects

Licensed architects stamp straightforward plans without full plan check.

Fixes: Routine projects waiting six months for box-checking review.

Coordinated department intake

Building, fire, water, planning, and transit all at the same table on day one.

Fixes: Late-arriving requirements from departments that weren't consulted upfront.

LADWP Housing Strike Force

Align utility operations with housing goals; revisit transformer staging and power-line setbacks unique to LA.

Fixes: 6-to-18-month transformer waits and idiosyncratic LADWP rules that no other major city imposes.

Power.

Fix who decides
Independent land-use board

Move routine housing decisions out of City Council to a professional board.

Fixes: Council members holding up projects to extract donations, favors, or concessions.

Delegated department authority

Decisions already approved by departments don't return to Council for another vote.

Fixes: Re-litigation of technical approvals by political pressure after the work is done.

Appeal-fee reform for non-neighbors

Higher appeal fees for objectors who don't live near the project.

Fixes: $200 weaponized appeals that trigger more than $20,000 of city staff time.

BuildLA transparency portal

A single public dashboard tracking every project, approval, permit, and response time.

Fixes: No way for voters or developers to see whether the city is actually hitting its targets.

Production.

Unlock more land and methods
Gentle density near transit

Allow duplexes, triplexes, and fourplexes on single-family-zoned land within walking distance of major transit.

Fixes: 70% of LA's residential land locked to one home per lot.

High-rise zones in select areas

Targeted upzoning for taller buildings on commercial corridors and employment hubs.

Fixes: Out-of-date height limits on land where intensity actually makes sense.

ADU separate sale (AB 1033 opt-in)

Let homeowners sell backyard cottages as separate starter homes.

Fixes: California passed this; LA never opted in, blocking a low-cost path to ownership.

Mass timber, single-stair, factory-built

Legalize building methods and typologies the current code blocks.

Fixes: Construction methods common in Europe and Asia that LA codes outlaw.

Office-to-residential conversion

Cut fees and code friction on converting empty office buildings to housing.

Fixes: Half-empty downtown towers that could be homes.

Condo defect liability reform

Fight at the state level to fix the rules that have effectively killed for-sale condo construction.

Fixes: A 10-year construction-defect statute that pushed builders out of the for-sale market entirely.

Super NOFA

Bundle every public funding source for affordable housing into one annual application window.

Fixes: Nonprofits applying to a dozen programs separately, each with its own rules and timeline.

Fee waivers for affordable units

Waive city development fees on projects with affordable units.

Fixes: Per-unit fees stacked at building permit issuance that price out affordable production.


The bridge

From 17,000 to 30,000.

Each lever below is a directional estimate, not a forecast. They are summed against the 2024 baseline using mid-point uplifts. The result — about 30,000 homes a year by 2028 — is presented as a target the path credibly aims at.

The bridge

From 17,000 to 30,000


How to know it's working

Five numbers a public dashboard should track.

A target without a public scoreboard is a press release. The path commits to a single transparency portal — BuildLA — surfacing every project, approval, permit, and response time. These are the metrics that should be on it:

  1. 01Median days from application to building permit, by project type
  2. 02Percentage of zoning-compliant projects hitting the 60-day target
  3. 03Annual ground-up multifamily permits — excluding ADUs and alterations
  4. 04Affordable units that have actually pulled building permits, not just received entitlements
  5. 05Independent land-use board case load and average decision time

The receipts already live elsewhere on this site — the live housing dashboard tracks the permits that have actually been issued. That is what the target is graded against.


The honest closing

30,000 falls short of what the state requires.

The state asks for 57,080 homes a year. The path delivers about 30,000. That is not the finish line.

It is also more housing than Los Angeles has permitted in any year since 1986 — and on the longer record, since 1950, when the city was still suburbanizing the San Fernando Valley.

Both things are true
30,000 is not enough. It is the largest single step Los Angeles has taken on housing in two generations.

Closing the rest of the gap to 57,000 takes a separate set of reforms — beyond the scope of the path described here. Those are the receipts of a future page.